Concrete Walkway / Sidewalk Calculator

Long and narrow is a different math problem. Quote your front path or sidewalk in yards and bags, with the thickness and joint rules that keep it crack-free.

WidthLengthThickness
Quick presets:
Please check this value.
Please check this value.
Please check this value.
Please check this value.
Please check this value.
Extra % for spillage and uneven subgrade. Please check this value.
Please check this value.

How to use this tool

  1. Measure the path run — overall length, and the finish width (3–4 ft feels comfortable for two people; 2 ft is a tight garden stroll).
  2. Split curves into straight sections and calculate each; the waste factor absorbs the gentle bends between them.
  3. Keep 4 in thickness (3 in only on very well-prepared base for pure foot traffic).
  4. Compare bags with ready-mix. Walkways are the classic bag project: a 3 × 30 ft path at 4 in is under 1.2 yd³.

How the result is calculated

Volume (ft³) = length (ft) × width (ft) × thickness (ft) × number of areas, multiplied by your waste factor, then divided by 27 for cubic yards. Circular areas use π × (diameter ÷ 2)². Bag counts use standard US yields: an 80 lb bag yields about 0.60 ft³ of mixed concrete, a 60 lb bag about 0.45 ft³.

Choosing the right numbers

Common walkway sizes at 4 in thick with 10% waste:

PathSizeConcrete80 lb bags
Garden stroll2 ft × 20 ft≈ 0.55 yd³≈ 25
Front path3 ft × 30 ft≈ 1.11 yd³≈ 51
Wide entry walk4 ft × 40 ft≈ 1.97 yd³≈ 91

Details worth the effort: tool a control joint every 3–4 ft of width in length (roughly every 3 ft for a 3 ft path is overkill — the rule of thumb is joints at 2–3× the width in feet), slope the walk ¼ in per foot to shed water toward the yard, and finish with a light broom texture for wet-weather grip.

Common mistakes to avoid

  • Too thin. 2 in paths crack into plates within a couple of winters. Four inches with a compacted base is the floor.
  • No joints. Long narrow slabs crack lengthwise without joints. Tool them in while the surface is still thumb-printable.
  • Steep driveway crossings without thickening. Where the walk crosses a driveway apron, thicken to 5–6 in or the car will break it.
  • Wide bags-only pours in hot weather. Concrete sets fast above 80 °F; a 90-bag pour needs a crew, not a solo effort.

Worked examples

Example — 3 ft × 30 ft front path, 4 in

Area = 90 ft². Volume = 90 × ⅓ = 30 ft³. With 10% waste = 33 ft³ ≈ 1.22 yd³ — about 55 of the 80 lb bags, or one short ready-mix load.

Frequently asked questions

How many bags of concrete for a 3×30 walkway?

About 55 of the 80 lb bags at 4 in thick with 10% waste — or roughly 1.25 cubic yards of ready-mix if a short-load delivery makes sense for you.

How wide should a walkway be?

3–4 ft lets two people walk abreast and is the usual front-path width. 2 ft works for informal garden paths.

How often do I need control joints?

Aim for joint spacing of about 2–3 times the slab width in feet — every 6–9 ft on a 3 ft walk — and never let a joint run area exceed roughly 100 ft².

Assumptions, sources and limits

  • Uniform thickness on a compacted base; no allowance for steps, landings or driveway crossings (calculate those separately and add).
  • Bag yields: standard US figures (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³).
  • General practice only — municipal sidewalks may have specified thickness and mix requirements.

Planning estimates only.