How to use this tool
- Pick the shape. Most slabs are rectangles. Choose Circle for round pads and fire-pit areas, or L-shape if your slab wraps around a corner, planter or existing structure.
- Measure the footprint. Measure length and width at the widest points, in whichever unit you prefer — the tool converts everything to feet internally.
- Set the thickness. For patios and walkways 4 in is common; driveways and garage floors usually need 5–6 in. Switch the unit to centimetres if you work metric.
- Add overage. Keep the default 10% waste factor unless your subgrade is unusually even and your forms are tight.
- Optional extras. Enter a gravel base depth to get the base material volume separately, switch to a thickened perimeter edge for car-loading slabs, or type your local ready-mix price to see cost.
How the result is calculated
Rectangular slab: volume (ft³) = length (ft) × width (ft) × thickness (ft)
Circular slab: volume (ft³) = π × (diameter ÷ 2)² × thickness (ft)
L-shape: full rectangle minus the cut-out area × thickness
Thickened edge: adds perimeter × edge width × (edge depth − slab thickness)
All dimensions are converted to feet first. The total is multiplied by the number of identical slabs and by your waste factor (default 10%), then divided by 27 to convert cubic feet to cubic yards. Bag counts use standard US yields: an 80 lb bag yields about 0.60 ft³ and a 60 lb bag about 0.45 ft³ of mixed concrete.
Choosing the right numbers
The thickness you choose drives everything: it decides both how much concrete you buy and how the slab performs over time. As a starting point for light residential work:
| Use | Typical thickness | Notes |
|---|---|---|
| Walkway, garden path | 3–4 in | Foot traffic only; well-compacted base matters more than thickness |
| Patio, shed pad | 4 in | The residential default |
| Guest driveway, side pads | 5 in | Occasional cars |
| Full driveway, garage floor | 5–6 in | Consider a thickened or separate footing edge where vehicles park |
| Light equipment / small tractor | 6 in + | Thickened edges strongly recommended |
Local building codes may set minimum thickness for specific uses — always check before ordering. If your slab will support a structure (carport, room addition), the edge may need to transfer loads to soil, which is a job for a designed footing rather than a simple thickened edge.
For L-shaped slabs, measure the cut-out carefully and enter its length and width. The tool subtracts that rectangle from the total footprint — this matches how most suppliers estimate, and rounding at the order desk will cover the corner irregularities.
Common mistakes to avoid
- Measuring the form instead of the string line. Forms bow outward during pouring. Measure your layout, then keep the 10% waste factor.
- Forgetting that "4-inch slab" means 4 inches everywhere. If part of your slab sits on soft soil, it can settle and effectively thin out. Compact the subgrade so your number matches reality.
- Ordering with no waste factor. Running one bag short is a bigger problem than having half a bag left — cold joints weaken the slab.
- Confusing bag yield with bag weight. An 80 lb bag does not yield 80 lb of volume. It mixes to roughly 0.60 ft³ — about ⅔ of a cubic foot.
- Ignoring gravel base volume. Base stone is ordered separately. If you enter a base depth, the tool quotes it in its own line so you don't pour your gravel budget into concrete.
- Circular slabs measured by radius and diameter mixed up. The tool wants the full diameter across the widest point — not the distance from centre to edge.
Worked examples
Example 1 — 10 ft × 12 ft patio, 4 in thick
Area = 10 × 12 = 120 ft². Volume = 120 × (4 ÷ 12) = 40 ft³. With 10% waste: 44 ft³ ≈ 1.63 yd³. That's about 74 of the 80 lb bags, or 98 of the 60 lb bags — at which point ready-mix delivery is usually cheaper.
Example 2 — 12 ft round pad, 4 in
Area = π × 6² ≈ 113 ft². Volume ≈ 113 × 0.333 ≈ 37.8 ft³. With 10% waste ≈ 41.6 ft³ ≈ 1.54 yd³.
Example 3 — L-shaped slab, 20 × 16 ft with a 5 × 5 ft planter cut-out, 5 in
Area = 320 − 25 = 295 ft². Volume = 295 × (5 ÷ 12) ≈ 122.9 ft³. With 10% waste ≈ 135.2 ft³ ≈ 5.01 yd³ — order a full 5.5 yards from the plant and agree a return policy for the surplus.
Frequently asked questions
How much concrete do I need for a 10×10 slab?
A 10 ft × 10 ft slab at the common 4 in thickness is 100 ft² × 0.333 ft ≈ 33.3 ft³, or about 1.24 yd³. With a 10% waste factor, order roughly 1.4 yd³ — or about 62 of the 80 lb bags if you are mixing by hand.
Is it cheaper to use bags or order ready-mix?
Bagged mix usually wins below roughly 1 cubic yard, and ready-mix wins above it. Bags cost more per yard of concrete but need no delivery minimum; ready-mix trucks typically charge for the full load once you cross the minimum order. Try our ready-mix vs bagged comparison tool for a side-by-side of your local prices.
How thick should my slab be?
For most residential uses: 4 in for patios and walkways, 5–6 in for driveways and garage floors. Anything carrying a structure or heavy equipment should be sized by a designer, not by a rule of thumb.
Should I include a waste factor?
Yes. Subgrade is rarely perfectly even and some mix always stays in the truck or wheelbarrow. Ten percent is the usual allowance; use fifteen if your base is soft or your slab is unusually large.
Does the calculator include the gravel base?
It quotes the base separately so you order the right amounts of both materials — concrete and gravel are sold differently and should never be added together.
Assumptions, sources and limits
- All formulas are plain geometry; the only constants are unit conversions (1 yd³ = 27 ft³, 1 ft = 0.3048 m) and standard US bag yields (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.30 ft³, 50 lb ≈ 0.375 ft³).
- The tool assumes a flat, uniformly thick slab on a prepared subgrade. It does not account for slope, crown or variable depth — add these to your waste factor instead.
- Gravel base volume is quoted separately and is not included in the concrete total.
- Thickness guidance in this page is general residential practice, not an engineering specification. Structural slabs, suspended slabs and anything carrying a building need design by a qualified professional.
- Prices are whatever you enter — the tool never invents a price for your area.
This tool provides estimates for planning purposes only. Confirm quantities with your supplier and consult local codes or a licensed engineer for structural work.