How to use this tool

  1. Measure the patio footprint — length and width for a rectangle, or the full diameter for a round pad.
  2. Keep 4 in thickness for furniture and foot traffic; go 5 in only if you plan to place a heavy outdoor kitchen or hot tub on the slab.
  3. Leave the waste factor at 10% — patio subgrades are usually well-tamped sand or gravel.
  4. Add your local ready-mix price for the material line, or compare it with the bag counts before deciding how to buy.

How the result is calculated

Volume (ft³) = length (ft) × width (ft) × thickness (ft) × number of areas, multiplied by your waste factor, then divided by 27 for cubic yards. Circular areas use π × (diameter ÷ 2)². Bag counts use standard US yields: an 80 lb bag yields about 0.60 ft³ of mixed concrete, a 60 lb bag about 0.45 ft³.

Choosing the right numbers

Patios are the friendliest slab project: foot traffic forgives small imperfections that a driveway would punish. Typical sizes at 4 in thick, 10% waste:

PatioSizeConcrete (yd³)
Bistro pad10 ft × 10 ft≈ 1.4
Small dining patio12 ft × 12 ft≈ 2.0
Family dining patio12 ft × 16 ft≈ 2.6
Large entertaining slab16 ft × 20 ft≈ 4.4
Round fire-pit pad12 ft diameter≈ 1.5

Below about 1.5 yd³, bags start making sense — a 10×10 patio is roughly 60 of the 80 lb bags, a long but manageable weekend pour for two people. Above 2 yards, the arithmetic flips firmly toward a ready-mix truck.

Plan control joints at roughly 8–10 ft spacing, and slope the slab a quarter inch per foot away from the house so water leaves the patio instead of pooling at your back door.

Common mistakes to avoid

  • No slope. A perfectly flat patio sends rainwater to the foundation. Set forms to fall ¼ in per foot away from the house.
  • Missing control joints. Concrete cracks where it wants to; joints give it a neat place to crack instead of across your dining set.
  • Underestimating bag mixing time. Sixty bags is six hours of mixing at a relaxed pace — the slab will start setting before the last bags are mixed unless you have helpers.
  • Placing a hot tub on a 4 in slab. A filled hot tub weighs 3,000+ lb. That is a 5–6 in reinforced slab, or better, a dedicated pad on its own base.

Worked examples

Example — 12 ft × 16 ft patio, 4 in

Area = 192 ft². Volume = 192 × ⅓ ≈ 64 ft³. With 10% waste ≈ 70.4 ft³ ≈ 2.61 yd³ — order 2.75 yards, or about 117 of the 80 lb bags if you would rather not pay a delivery minimum.

Example — 14 ft round pad, 4 in

Area = π × 7² ≈ 153.9 ft². Volume ≈ 51.3 ft³. With 10% waste ≈ 56.4 ft³ ≈ 2.09 yd³.

Frequently asked questions

How much concrete for a 12×16 patio?

At 4 in thick: 192 ft² × ⅓ ft = 64 ft³, about 2.6 yd³ with 10% waste — order 2.75 yards.

Can I pour a patio with bags?

Yes, up to roughly 1.5–2 yd³ if you have helpers and can finish in one session. Beyond that, a ready-mix truck is faster, more consistent and usually cheaper per yard.

How thick should a patio slab be?

4 in is standard for furniture and foot traffic. Use 5–6 in only under concentrated loads such as hot tubs or outdoor kitchens, with appropriate reinforcement.

Assumptions, sources and limits

  • Uniform-thickness flat slab on a prepared subgrade; no allowance is made for slopes, steps or decorative stamping depth.
  • Bag yields: 80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³ (standard US figures).
  • Thickness advice is general practice for light residential use; anything structural or heavily loaded needs its own design.