How to use this tool
- Measure inside the foundation walls (or inside your form layout) — the floor sits between them, not over them.
- Keep the 5 in slab thickness default for passenger cars; 6 in if you store heavy equipment or a lifted truck.
- Leave the thickened edge on. Most garage slabs pour with a deeper perimeter that carries the wall loads and resists cracking at the door apron.
- Enter gravel base depth (4 in compacted is typical) to get the base material quantity separately.
How the result is calculated
Volume (ft³) = length (ft) × width (ft) × thickness (ft) × number of areas, multiplied by your waste factor, then divided by 27 for cubic yards. Circular areas use π × (diameter ÷ 2)². Bag counts use standard US yields: an 80 lb bag yields about 0.60 ft³ of mixed concrete, a 60 lb bag about 0.45 ft³.
Thickened edge: the tool adds perimeter × edge width × (edge depth − slab thickness) to the slab volume, then applies the waste factor. Gravel base is quoted separately as length × width × base depth ÷ 27.
Choosing the right numbers
Typical garage floors at 5 in slab plus a 12 in × 12 in thickened edge, 10% waste:
| Garage | Inside size | Slab + edge (yd³) |
|---|---|---|
| 1-car | 12 ft × 22 ft | ≈ 5.5 |
| 2-car compact | 20 ft × 20 ft | ≈ 8.3 |
| 2-car standard | 22 ft × 22 ft | ≈ 10.0 |
| 2-car + workshop | 24 ft × 26 ft | ≈ 13.0 |
Details that matter more than an extra half inch of thickness: a vapor barrier under the slab, control joints at doorways and 10–12 ft spacing, and a slight slope toward the door (about ⅛ in per foot) so melted snow and rain drain out instead of under your shelving.
Common mistakes to avoid
- Forgetting the edge volume. A 12-in-deep grade-beam edge adds 10–20% to the concrete total on a two-car garage — skipping it leaves you a yard short mid-pour.
- No vapor barrier. Ground moisture wicks through bare slabs, rusting tools and peeling floor coatings. It costs almost nothing at pour time and cannot be added later.
- Flat floor. Without slope to the door, water pools. Set the form tops before ordering.
- Pouring over uncompacted backfill. The trench along the walls settles years later and the edge cracks. Compact in lifts.
Worked examples
Example — 20 ft × 20 ft garage, 5 in slab, 12×12 in edge
Slab: 400 ft² × (5 ÷ 12) ≈ 166.7 ft³. Edge: 80 ft perimeter × 1 ft × (1 − 5/12) ft ≈ 46.7 ft³. Total ≈ 213.3 ft³; with 10% waste ≈ 234.7 ft³ ≈ 8.69 yd³ — order 9 yards, plus a separate gravel line of about 1.98 yd³ for a 4 in base.
Frequently asked questions
How many yards of concrete for a 2-car garage floor?
A 20×20 ft interior at 5 in with a 12×12 in thickened edge needs about 8.7 yd³ including 10% waste — order 9 yards.
Should the garage slab edge be thickened?
Usually yes. The perimeter carries wall or door-apron loads and resists cracking where vehicles roll across the edge. A 12 in deep × 12 in wide grade-beam edge is a common residential detail.
Does the calculator include the gravel base?
It quotes the base volume separately so you can order stone and concrete correctly — they are different materials with different units.
Assumptions, sources and limits
- Slab pours between foundation walls or forms; edge volume is a simple rectangular grade beam around the perimeter.
- Bag yields: standard US figures (80 lb ≈ 0.60 ft³). A garage floor is effectively always a ready-mix pour.
- No allowance for floor drains, radiant tubing displacing concrete, or embedded anchor bolts — small effects usually absorbed by the waste factor.
- General practice only; attached-garage slabs may have code-specific requirements in your area.
Planning estimates only — confirm with your supplier and local building department.