Concrete Tube / Sonotube Calculator

Fill a cardboard tube form (sonotube) with the right amount: per-tube and whole-run totals in yards or bags, with the height above grade included.

Inner diameterHeight
Quick presets:
Please check this value.
Please check this value.
Most tubes sit 1–4 in proud of grade so the post base never touches soil. Please check this value.
Please check this value.
Tube pours are tidy — 5% covers the scoop losses. Please check this value.
Please check this value.
Please check this value.

How to use this tool

  1. Pick the tube diameter. It is dictated by the footing below it and the post above it: a common deck pairing is a 16 in footing pad under a 10–12 in tube carrying a 6×6 post.
  2. Measure the below-grade pour — from the bottom of the hole (or the footing pad) up to grade.
  3. Keep the above-grade stub at the default 2 in unless your detail says otherwise. It keeps the post base out of standing water.
  4. Set the tube count — or one tube per post plus a spare if the run is long.
  5. Check "tubes to buy" against the stock length on the rack; 4 ft stock is the everyday deck size, 8 ft for deep frost country.

How the result is calculated

Per tube: π × (diameter ÷ 2)² × fill height — the fill height is below-grade depth plus the stub you leave above grade. The run total multiplies by the tube count and your waste factor; 1 yd³ = 27 ft³. Bag counts use standard US yields (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³). The "tubes to buy" figure divides the total fill height across the stock length you select, with a small allowance for cutting.

Choosing the right numbers

Tube forms earn their keep three ways: they hold the hole walls from sloughing in, they give you a clean plumb column, and they keep soil from bleeding into the fresh pour. Sizing follows the post and the footing:

Post aboveCommon tube80 lb bags per 4 ft tube*
4×4 railing or light post8 in≈ 3
4×4 fence / gate10 in≈ 4
6×6 deck post12 in≈ 5
6×6 post, heavy deck16 in≈ 9

*4 ft fill, 5% waste.

Below the tube, either the hole itself or a poured footing pad spreads the load to the soil. In frost country the whole assembly — pad and tube — must reach below the frost line. Backfill around the tube and brace it plumb in two directions before the truck arrives; a tube that shifts mid-pour is nearly impossible to straighten after.

Common mistakes to avoid

  • Leaving the cardboard in below grade forever. Buried cardboard stays damp and can hold water against the column; strip it to grade or use a form designed to stay.
  • Forgetting the above-grade stub in the volume and the cut length — two inches per tube across twelve tubes is a real shortfall.
  • Pouring past the tube's rating height. Wet concrete pushes hard; tall 12 in pours need external bracing, not confidence.
  • Ordering by tube count alone. A 16 in × 4 ft tube is over half a yard by itself — bag math, not tube math, is what the supplier needs.
  • No level reference at the top. Mark the finish height on the inside of every tube with a story pole from a common benchmark.

Worked examples

Example — 6 deck footings, 12 in tubes, 36 in below grade + 2 in stub

Fill = 38 in ≈ 3.17 ft. Per tube = π × 0.5² × 3.17 ≈ 2.49 ft³. Six tubes with 5% waste ≈ 15.7 ft³ ≈ 0.58 yd³ — 27 bags of 80 lb, or a fraction of a short-load.

Example — single 16 in tube, 48 in pour

π × (8/12)² × 4 ≈ 5.59 ft³ with waste ≈ 5.87 ft³ ≈ 0.22 yd³ — about 10 bags of 80 lb, and one 8 ft tube cut in half.

Frequently asked questions

How much concrete is in a 12 inch sonotube?

Per foot of height, a 12 in tube holds π × 0.5² × 1 ≈ 0.79 ft³, so a 4 ft pour is about 3.2 ft³ — roughly 0.12 yd³ or 5–6 bags of 80 lb mix.

Do I remove the sonotube form after the pour?

Strip it down to grade once the concrete has cured enough to handle (a day or two). Below grade the cardboard will slowly rot anyway; above grade it traps moisture against the column.

What diameter tube for a 6×6 post?

A 12 in tube is the everyday answer for residential deck posts, paired with a wider footing pad below. Heavier decks step up to 16 in — size from the deck design, not habit.

Should the tube sit above grade?

Yes — 1–4 in keeps the post base and any hardware clear of soil and standing water. Include that stub in your volume, which this tool does by default.

Assumptions, sources and limits

  • Vertical cylinders of the nominal tube diameter; cardboard forms vary a few hundredths and the waste factor absorbs it.
  • Below-grade hole assumed wide enough that the tube is not carrying soil pressure in soft ground.
  • Bag yields use standard US figures (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³).
  • "Tubes to buy" is a cutting plan for the stock length selected, with a 5% cutting allowance — not a structural recommendation.
  • Prices come only from your own input.

Planning estimates only. Tube size, footing pad and depth must follow your local code and the structural design for the deck or structure above.