Ready-Mix vs Bagged Concrete Cost Calculator

Bags or truck? Enter both sides — delivered prices, not shelf prices — and get the verdict with the real crossover point for your project.

Please check this value.
Please check this value.
Please check this value.
Please check this value.
Please check this value.
$/hour — optional. Adds the real cost of mixing day to the bag side. Please check this value.

How to use this tool

  1. Enter the pour size — the answer is mostly a function of volume.
  2. Price both sides honestly. Truck side: the plant quote plus fees. Bag side: shelf price — including the drive to haul two tons of bags.
  3. Pick your mixing setup. The mixer-vs-trough choice changes mixing time by 2×, which matters once you price your hours.
  4. Add your time's value if the schedule matters — $0 says the weekend is free, which it rarely is.

How the result is calculated

Truck side: yards × price/yd³ + fees. Bag side: bags × price, where bags = yards × 27 ÷ 0.60 ft³ per 80 lb bag. Mixing time uses realistic per-bag figures — about 3 minutes with a portable mixer, 6 hand-mixing, 1.5 for dry-poured fast-set — and your optional hourly rate prices that time. The verdict compares the two totals; the hidden tiebreaker is continuity: bags place in small batches over hours, ready-mix in one structural pour.

Choosing the right numbers

The crossover, roughly, at typical prices ($165/yd³ + $75 fees vs $6.50/80 lb bag):

Pour sizeTruckBagsSensible choice
0.3 yd³ (8 bags)$125+$52Bags — no contest
0.7 yd³ (20 bags)$190$130Bags — mixer earned its rental
1 yd³ (45 bags)$240$293Truck — money crosses, schedule seals it
2 yd³ (90 bags)$405$585Truck — 4+ hours of mixing, worse concrete
3+ yd³Wins on every axisNot practicalTruck

Beyond money, two non-price factors: continuity (a slab placed from 60 separate batches shows cold joints between them; ready-mix is one chemical event) and fatigue (bag 40 mixes differently than bag 4, and the crew is the reason). For post holes, fast-set bags dodge both problems entirely — that's the "dry pour" row's special case.

Common mistakes to avoid

  • Comparing shelf price to plant price. $6.50/bag looks cheap until ×90 bags and a truck bed — and the plant quote's fees were never in your head math.
  • Ignoring the mixing day entirely. Two tons of bags is a physical event with a schedule attached; the labor-value line exists to make that visible.
  • Bags on a slab. Batch-to-batch variation plus the working window make bagged slabs structurally and cosmetically worse past ~0.5 yd³.
  • Trucks on a mailbox pad. The minimum-load fee turns a $50 pour into a $250 one — the small end belongs to bags.
  • Forgetting the return trip. Unopened bags return fine; a short truck pour does not re-schedule for free.

Worked examples

Example — 1.5 yd³: truck $322.50 vs 68 bags $442

Truck (incl. $75 fees) wins on money by ~$120; with 3.4 mixer-hours valued at $25/hr, by $205 — and by one continuous pour.

Example — 0.4 yd³ post pad: truck $139 vs 18 bags $117

Bags win even before the truck's small-order fee realities — and fast-set dry-pour makes it a 27-minute job with no mixer at all.

Frequently asked questions

Is it cheaper to buy bags or order concrete?

Under roughly 1 yd³ (45 bags of 80 lb), bags — the truck's minimums and fees dominate. Above it, ready-mix usually wins on cost and always wins on placement quality. Run your two prices through the calculator for the local answer.

How much labor is mixing bagged concrete?

About 3 minutes per 80 lb bag with a portable mixer, twice that by hand. A yard — 45 bags — is 2–4.5 hours of mixing inside one working session, which is the real cost the shelf price hides.

Can I pour a slab with bagged concrete?

Small ones, yes — under about 0.5 yd³ (a 7×7 pad at 4 in) it's practical. Beyond that the batch-to-batch timing shows as cold joints and the mixing day becomes the project.

Assumptions, sources and limits

  • Bag math uses the 80 lb yield (0.60 ft³); if you'll buy 60 lb bags, their count runs 1.33× higher at proportionally lower bag prices.
  • Mixing time benchmarks: ~3 min/bag (mixer), ~6 (hand), ~1.5 (dry fast-set) — crew experience and weather move these.
  • Truck side excludes stand-by risk and minimum-load billing unless entered in fees.
  • Every rate is your own input.

Decision tool for the bag-vs-truck question. Schedule, site access and crew strength are part of the answer the numbers can't see.