How to use this tool
- Start with the concrete line — yards and the plant's price, fees included (the cost and delivery calculators feed this).
- Add labor from your own math — the labor calculator's output drops straight in.
- Walk the ancillary lines. Reinforcement, form lumber, base gravel, finish extras — most pours touch three of the four even when the budget forgot them.
- Keep the 10% contingency. It is not pessimism; it is the price of being honest about what you don't know yet.
How the result is calculated
Project total = (concrete + fees + labor + equipment + reinforcement + forms + base + finishing) × (1 + contingency %). Every line is optional except the concrete — leave blank what your job doesn't have, and the estimator prices what remains. The all-in per-yard figure and the concrete's share of the total are the two sanity checks: if concrete is under 40% of the total, you're looking at a labor-and-prep project that happens to include concrete.
Choosing the right numbers
How a real budget assembles — a 20 × 20 ft driveway, 6 in, Midwest pricing:
| Line | Amount | Share |
|---|---|---|
| Concrete 7.4 yd³ @ $165 | $1,223 | 32% |
| Delivery + fees | $75 | 2% |
| Labor (4 × 8 h × $45) | $1,440 | 38% |
| Equipment rental | $180 | 5% |
| Rebar + mesh | $220 | 6% |
| Form lumber | $150 | 4% |
| Base gravel | $200 | 5% |
| Subtotal | $3,488 | |
| Contingency 10% | $349 | |
| Project total | $3,837 | $9.59/ft² |
That shape — concrete under half the total — is normal and repeats across projects. It is why quotes "for concrete" cost more than the concrete: the other lines were always there, just unpriced.
Common mistakes to avoid
- Budgeting the concrete line only. The most common DIY overrun: the pour happens, then reinforcement, forms and gravel get bought at retail in panic mode.
- No contingency. Bad weather days, a rebar detail, a truck that can't reach the back yard — 10% covers the ordinary surprises; 0% covers none of them.
- Forgetting the base. Gravel, compaction and grading are real money and real labor — and the slab's lifespan depends on them.
- Skipping finish extras. Sealer, saw-cut joints, color — each is small, and together they're a real line.
- Double-counting or half-counting labor. If your labor line came from the crew calculator, don't also add "helping hands" pizza money as a separate cost without a number.
Worked examples
Example — small patio, material-heavy (DIY labor)
3.3 yd³ @ $165 + $75 fees = $620. DIY labor: $0 wage but $180 rental + $120 rebar/mesh + $90 forms + $100 gravel = $1,110 with contingency — $3.46/ft², concrete's share 49%.
Example — the driveway table above
$3,837 all-in at $9.59/ft² — concrete itself $1,223 (38%). Compare that to a "concrete costs $4/ft²" instinct to see why budgets break.
Frequently asked questions
What does a concrete project really cost, all in?
Typically 2.5–4× the concrete line once labor, prep, reinforcement and finishing are counted. Assemble your own lines above — the honest total is the one you build line by line.
How much contingency should I add?
10% for straightforward pours with experienced help; 15–20% for first-time crews, difficult access, or weather-sensitive schedules. The contingency you skip shows up as a mid-project loan from your own wallet.
Why is the concrete itself only part of the total?
Because a slab is a system: base prep, reinforcement, forms, placement labor and finishing each cost real money, and together they usually outweigh the material.
Assumptions, sources and limits
- Every line is priced by your own input; the tool assembles and applies contingency — it does not guess market rates.
- Contingency applies to the subtotal, uniformly.
- Permits, engineering, and demolition of existing concrete are outside the default lines — add them into extras or labor if they apply.
- Per-yard and per-square-foot figures divide the total by the concrete volume and footprint you entered.
Budget assembly for planning. Contractor bids and supplier tickets are the binding numbers.