How to use this tool
- Get the plant's terms first. Minimum load, small-load policy, and per-order fees vary by plant — this tool prices their numbers, it doesn't guess them.
- Enter your true yardage (waste included) and the per-yard price.
- Match the fee mode to their policy — some charge per short yard, some flat, some just bill the minimum.
- Add the per-order fees (delivery, fuel/environmental) — they hit small orders hardest on a per-yard basis.
- Enter a local bag price to settle the bags-vs-truck question with real numbers.
How the result is calculated
Delivered cost = billed yards × price per yard + under-minimum fee + per-order fees. Under the plant's minimum, one of three policies applies: an extra charge per short yard, a flat small-load fee, or billing the minimum outright. The effective per-yard cost divides everything by the yards you actually get — which is how a "cheap" 2-yard order turns into $300/yd concrete. The bag comparison multiplies your yards by 27 ft³ ÷ 0.60 ft³ per 80 lb bag.
Choosing the right numbers
Why small orders cost more per yard: a mixer truck costs the plant nearly the same to batch, load, drive and wash whether it carries 3 yards or 10. The fees exist to make small orders pay their way:
| Order size | Typical shape of the bill | Effective $/yd³* |
|---|---|---|
| 1 yd³ | Minimum billed (4) + delivery | ≈ $740 |
| 2 yd³ | Minimum billed (4) + delivery | ≈ $400 |
| 3 yd³ | 3 yd + small-load fee + delivery | ≈ $260 |
| 4–10 yd³ | Yards + delivery | ≈ $190 |
*At $165/yd³, $75 per-order fees, 4 yd³ minimum — illustrative, your plant differs.
Against that, bags run roughly $180–260 per yard delivered to your trunk ($6–7 per 80 lb bag at $6.50/bag), plus your mixing labor. That's why the crossover sits around 1–1.5 yards for most people — below it bags win on money and schedule freedom; above it the truck wins and the fees stop mattering.
Common mistakes to avoid
- Comparing bag price to concrete price per yard. The truck's real price includes minimums and fees; bags' real price includes two tons of hauling. Compare delivered-to-pour costs, both sides.
- Forgetting your labor in the bag math. 45 mixed batches is 2–3 hours of hard work and a working window that closes — sometimes the truck fee is buying back your Saturday, and that's worth it.
- Paying the minimum for yards you can't place. If 4 yards is billed and your hole holds 2.5, you're pouring 1.5 yards somewhere worse — or paying to haul it away.
- Not asking about "will-call" discounts. Some plants price small orders better on flexible timing — the same yards, cheaper bill.
- Ignoring washout. Truck washout areas and return-to-plant policies differ; a small load with a messy site can pick up extra charges.
Worked examples
Example — 2.5 yd³, $165/yd³, 4 yd³ minimum billed, $75 fees
Billed = 4 × 165 = $660 + $75 = $735 total — $294 per actual yard. Bags at $6.50: 113 bags ≈ $735 — dead even; the tiebreaker is your mixing labor vs the plant's schedule.
Example — 3 yd³ with $25/yd shortfall fee instead
3 × 165 = $495 + (1 × 25) + 75 = $595 — $198/yd³. The fee mode alone swung the bill by $140.
Frequently asked questions
What is a short load of concrete?
An order below the plant's batching minimum — commonly 4 yards. Plants charge for the shortfall or bill the minimum, because a half-loaded truck costs them nearly as much as a full one.
How much does a small concrete delivery cost?
Varies with the plant's policy, but small orders routinely land at $250–700 per actual yard once minimums and fees apply — versus ~$190/yd³ for full loads. Run your plant's numbers through the estimator.
When are bags cheaper than a truck?
Generally under about 1–1.5 yd³ — roughly 45 bags of 80 lb. Above that the truck's per-yard cost drops fast while bags add two tons of hauling and hours of mixing.
Can I avoid the short-load fee?
Sometimes: round your order up to the minimum and plan a use for the extra (a thickened edge, a second pad), or ask about will-call timing discounts and shared loads with a neighbor's project.
Assumptions, sources and limits
- Fee structures are the three common US plant policies; your supplier's written terms govern.
- Bag comparison uses the 80 lb yield (0.60 ft³) and your entered price; it does not price hauling, mixing labor or time.
- Per-order fees (delivery, fuel/environmental) are entered as a single number; itemize if your ticket does.
- Effective per-yard cost uses yards delivered, not yards billed.
Decision-support estimates. The plant's quote is the binding number — use this to interrogate it, not to replace it.