Short Load Fee Estimator

Small truck orders carry hidden fees. Enter your yardage and the plant's terms to see the real delivered cost — and whether bags beat the truck this time.

Please check this value.
Please check this value.
Yards most plants batch as a floor — 4 is common; ask your plant. Please check this value.
Please check this value.
Dollars — per yard of shortfall, or flat, depending on the mode above. Please check this value.
The per-order charges plants add regardless of size. Please check this value.
Price of an 80 lb bag locally, to compare against the truck. Please check this value.

How to use this tool

  1. Get the plant's terms first. Minimum load, small-load policy, and per-order fees vary by plant — this tool prices their numbers, it doesn't guess them.
  2. Enter your true yardage (waste included) and the per-yard price.
  3. Match the fee mode to their policy — some charge per short yard, some flat, some just bill the minimum.
  4. Add the per-order fees (delivery, fuel/environmental) — they hit small orders hardest on a per-yard basis.
  5. Enter a local bag price to settle the bags-vs-truck question with real numbers.

How the result is calculated

Delivered cost = billed yards × price per yard + under-minimum fee + per-order fees. Under the plant's minimum, one of three policies applies: an extra charge per short yard, a flat small-load fee, or billing the minimum outright. The effective per-yard cost divides everything by the yards you actually get — which is how a "cheap" 2-yard order turns into $300/yd concrete. The bag comparison multiplies your yards by 27 ft³ ÷ 0.60 ft³ per 80 lb bag.

Choosing the right numbers

Why small orders cost more per yard: a mixer truck costs the plant nearly the same to batch, load, drive and wash whether it carries 3 yards or 10. The fees exist to make small orders pay their way:

Order sizeTypical shape of the billEffective $/yd³*
1 yd³Minimum billed (4) + delivery≈ $740
2 yd³Minimum billed (4) + delivery≈ $400
3 yd³3 yd + small-load fee + delivery≈ $260
4–10 yd³Yards + delivery≈ $190

*At $165/yd³, $75 per-order fees, 4 yd³ minimum — illustrative, your plant differs.

Against that, bags run roughly $180–260 per yard delivered to your trunk ($6–7 per 80 lb bag at $6.50/bag), plus your mixing labor. That's why the crossover sits around 1–1.5 yards for most people — below it bags win on money and schedule freedom; above it the truck wins and the fees stop mattering.

Common mistakes to avoid

  • Comparing bag price to concrete price per yard. The truck's real price includes minimums and fees; bags' real price includes two tons of hauling. Compare delivered-to-pour costs, both sides.
  • Forgetting your labor in the bag math. 45 mixed batches is 2–3 hours of hard work and a working window that closes — sometimes the truck fee is buying back your Saturday, and that's worth it.
  • Paying the minimum for yards you can't place. If 4 yards is billed and your hole holds 2.5, you're pouring 1.5 yards somewhere worse — or paying to haul it away.
  • Not asking about "will-call" discounts. Some plants price small orders better on flexible timing — the same yards, cheaper bill.
  • Ignoring washout. Truck washout areas and return-to-plant policies differ; a small load with a messy site can pick up extra charges.

Worked examples

Example — 2.5 yd³, $165/yd³, 4 yd³ minimum billed, $75 fees

Billed = 4 × 165 = $660 + $75 = $735 total — $294 per actual yard. Bags at $6.50: 113 bags ≈ $735 — dead even; the tiebreaker is your mixing labor vs the plant's schedule.

Example — 3 yd³ with $25/yd shortfall fee instead

3 × 165 = $495 + (1 × 25) + 75 = $595 — $198/yd³. The fee mode alone swung the bill by $140.

Frequently asked questions

What is a short load of concrete?

An order below the plant's batching minimum — commonly 4 yards. Plants charge for the shortfall or bill the minimum, because a half-loaded truck costs them nearly as much as a full one.

How much does a small concrete delivery cost?

Varies with the plant's policy, but small orders routinely land at $250–700 per actual yard once minimums and fees apply — versus ~$190/yd³ for full loads. Run your plant's numbers through the estimator.

When are bags cheaper than a truck?

Generally under about 1–1.5 yd³ — roughly 45 bags of 80 lb. Above that the truck's per-yard cost drops fast while bags add two tons of hauling and hours of mixing.

Can I avoid the short-load fee?

Sometimes: round your order up to the minimum and plan a use for the extra (a thickened edge, a second pad), or ask about will-call timing discounts and shared loads with a neighbor's project.

Assumptions, sources and limits

  • Fee structures are the three common US plant policies; your supplier's written terms govern.
  • Bag comparison uses the 80 lb yield (0.60 ft³) and your entered price; it does not price hauling, mixing labor or time.
  • Per-order fees (delivery, fuel/environmental) are entered as a single number; itemize if your ticket does.
  • Effective per-yard cost uses yards delivered, not yards billed.

Decision-support estimates. The plant's quote is the binding number — use this to interrogate it, not to replace it.