How to use this tool
- Measure the pour — length and width for a slab or pad, or the hole dimensions for footings (use the circle shape for tubes).
- Set the thickness honestly. Bags hide thin pours poorly: 4 in of patio over 3 in of plan is a 25% shortfall.
- Keep the waste factor at 10% for formed work; 5% is enough for tidy tube pours.
- Check the crossover. If the 80 lb count runs past ~45 bags (1 yd³), compare against a short-load delivery before committing to the pallet math.
How the result is calculated
Volume (ft³) = length (ft) × width (ft) × thickness (ft) × number of areas, multiplied by your waste factor, then divided by 27 for cubic yards. Circular areas use π × (diameter ÷ 2)². Bag counts use standard US yields: an 80 lb bag yields about 0.60 ft³ of mixed concrete, a 60 lb bag about 0.45 ft³.
Bag counts divide your waste-adjusted volume by each size's standard yield (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 50 lb ≈ 0.375 ft³, 40 lb ≈ 0.30 ft³) and round up.
Choosing the right numbers
Bag shopping by project, at 4 in thick with 10% waste:
| Project | 80 lb bags | 60 lb bags |
|---|---|---|
| Mailbox pad 2×2 ft | 2 | 3 |
| AC condenser pad 3×3 ft | 5 | 6 |
| Shed floor 8×8 ft | 32 | 43 |
| Patio 10×12 ft | 61 | 81 |
| One-car pad 10×20 ft | 102 | 136 |
Fast-setting 50 lb mix pours dry into holes and sets in minutes — ideal for fence posts, poor for anything you need to screed. Regular mix in 60 or 80 lb gives you the working window slabs need.
Common mistakes to avoid
- Buying by pallet price without the count. A pallet of 80 lb is 42 bags ≈ 0.93 yd³; ordering two pallets for a 1.1 yd³ job is normal, three is waste.
- Mixing bag brands mid-pour. Different yields and strengths in adjacent batches set at different rates and can show as shading and weakness.
- Forgetting the working window. Bags mean small batches; a slab that takes 4 hours to place from bag mixing shows cold joints.
- No spares. A torn bag, a rocky hole, an over-deep spot — buy 5% over the count, return what you don't open.
Worked examples
Example — shed floor 8 × 8 ft, 4 in, 10% waste
64 ft² × 0.333 ≈ 21.3 ft³; with waste ≈ 23.5 ft³. Bags: 40 of 80 lb, or 53 of 60 lb, or 63 of 50 lb.
Example — AC pad 3 × 3 ft, 4 in
9 ft² × 0.333 = 3 ft³; with 10% ≈ 3.3 ft³ → 6 bags of 80 lb (or 8 of 60 lb). One wheelbarrow-able pour.
Frequently asked questions
How many bags of concrete do I need for a 10x10 slab?
At 4 in thick with 10% waste: 100 ft² × 0.333 ≈ 33.3 × 1.1 ≈ 36.7 ft³ → 62 bags of 80 lb or 82 of 60 lb. At that count, price a short-load truck too — it often wins.
What size bag is cheapest per yard?
Usually 60 lb or 80 lb bags price out nearly equal per ft³ of yield; 40 lb and fast-set 50 lb bags carry a premium per foot. Compare store shelf prices against the yields: divide price by yield.
When should I stop bagging and order a truck?
Around 1 yd³ — 45 bags of 80 lb. Above that, hand mixing 45+ batches into one continuous pour is where ready-mix becomes cheaper per yard and vastly better for the slab's integrity.
Assumptions, sources and limits
- Flat rectangular or circular pours of uniform thickness on prepared ground.
- Bag yields are the standard US figures; your brand's printed yield wins if it differs.
- Counts round up to whole bags — you cannot buy half a bag, and running short mid-pour is the worst outcome.
- Prices come only from your own input.
Planning estimates for bagged work. Structural slabs and anything the code governs is a ready-mix and engineering conversation.