How to use this tool
- Pick the direction — feet to yards when you've measured a pour and need an order size; yards to feet when a delivery amount needs to make sense against your footprint.
- Type the value. The answer updates live, with cubic meters alongside for metric drawings or suppliers.
How the result is calculated
1 cubic yard = 27 cubic feet — a yard measures 3 ft on each side, so 3 × 3 × 3 = 27. Conversions: cubic feet ÷ 27 → yards; cubic yards × 27 → feet. For metric: 1 yd³ ≈ 0.7646 m³ and 1 ft³ ≈ 0.0283 m³. That is the entire rule — every other "yard math" mystery in concrete work reduces to it.
Choosing the right numbers
Landmark conversions worth memorizing for concrete work:
| Cubic feet | Cubic yards | Roughly |
|---|---|---|
| 1 ft³ | 0.037 yd³ | One 80 lb bag's yield ≈ 0.6 ft³ |
| 13.5 ft³ | 0.5 yd³ | Half-yard short loads |
| 27 ft³ | 1 yd³ | 81 ft² at 4 in thick |
| 40.5 ft³ | 1.5 yd³ | Typical shed floor |
| 54 ft³ | 2 yd³ | Small patio |
| 81 ft³ | 3 yd³ | One-car driveway pad |
Why the units split the way they do: your tape measure speaks feet, the plant's batch ticket speaks yards, and bags speak pounds. The 27 rule is the bridge between all three — and the most common estimating error in concrete work is forgetting it at the boundary (measuring in feet, ordering in yards, without dividing by 27).
Common mistakes to avoid
- Dividing by 9. Nine converts square feet to square yards — area. Volume needs 27. Mixing the two rules is the classic order-size error.
- Converting the wrong side of a mixed expression. If thickness is in inches and footprint in feet, convert inches to feet (÷ 12) first, then multiply — then divide by 27 at the very end.
- Rounding mid-chain. Keep full precision through the multiplication, round once at the end — especially on small pours where 0.01 yd³ matters.
- Trusting rounded conversions for orders. 0.29 yd³ calculated means ordering 0.25 or 0.5 from the plant — batch steps are quarter-yard, not continuous.
Worked examples
Example — measured 148.5 ft³
148.5 ÷ 27 = 5.5 yd³ — with 10% waste in the original number, that is the plant order.
Example — the plant delivers 4.75 yd³
4.75 × 27 = 128.25 ft³ — spread over a 4 in pour, that is 385 ft² of coverage.
Frequently asked questions
How many cubic feet are in a cubic yard?
27. A yard is 3 feet, so a cubic yard is 3 × 3 × 3 = 27 cubic feet. Multiply yards by 27; divide feet by 27.
Is 9 the conversion for volume too?
No — 9 converts square feet to square yards (area). Volume is 27. If your order is off by a factor of three, this is usually why.
How many cubic yards is 100 cubic feet?
100 ÷ 27 ≈ 3.70 yd³. At 4 in thick, 100 ft³ covers 300 ft².
Assumptions, sources and limits
- Pure unit conversion — no waste factors, no batch rounding; apply those at the order stage.
- Metric factors: 1 ft³ = 0.0283168 m³, 1 yd³ = 0.764555 m³ (both exact by definition of the inch).
A math utility — everything else about the order is a different tool.