Almost every concrete question reduces to one calculation: surface area × thickness, converted to cubic yards, plus a waste allowance. Get those four pieces right and you will order well every time — for a patio, a footing, a post hole or a driveway. This guide walks through each piece and shows the shortcuts that keep you honest.

The core formula

Concrete volume in cubic feet:

volume (ft³) = length (ft) × width (ft) × thickness (ft)

Cubic yards — the unit every US ready-mix plant sells in:

yards = ft³ ÷ 27

Worked from the other direction: one cubic yard covers about 80 ft² at 4 in thick, 54 ft² at 6 in, or 324 ft² at just 1 in. Memorizing those three ratios lets you sanity-check any estimate on the spot.

Step 1 — measure honestly

Measure the actual layout, not the ideal rectangle in your head. Forms bow, corners are not square, and "about ten feet" quietly becomes eleven. For irregular shapes, split the area into rectangles and circles, calculate each, and add them up.

Step 2 — pick thickness for the use, not the budget

UseTypical thickness
Walkways, garden paths3–4 in
Patios, shed pads4 in
Driveways, garage floors5–6 in
Post footings, light wallsdepth per plan / code

Thickness is the number people cheat to save money — and the number that punishes the cheat most visibly. A 4 in driveway under daily car parking fails in years, not decades.

Step 3 — add the waste factor

Subgrade is uneven, some mix stays in the truck, and spilling happens. The standard allowance is 10%; use 15% on rough or soft ground, or when pouring in sections you cannot finish seamlessly. One caution in the other direction: truck returns and short-load fees both cost money, so do not simply round a 3.2 yd³ job up to 5 yards — most plants will sell you a full yard above your estimate only if you actually need it.

Step 4 — bags or truck?

Bagged concrete (40, 50, 60, 80 lb bags) yields roughly 0.30–0.60 ft³ of mixed material per bag. As a rule of thumb:

  • Under ~1 cubic yard: bags are competitive, especially where delivery minimums apply.
  • Above ~1–1.5 yards: ready-mix is usually cheaper per yard and vastly less labor.
  • Above ~3 yards: it is a truck job in almost every scenario — and all bags must be mixed within one pour window anyway.

Special shapes

  • Circles: π × radius² × thickness. For a round patio, measure the full diameter and halve it.
  • Cylindrical holes (posts): same formula, in depth. Subtract the post's own volume if it is thick.
  • Trenches and footings: run × width × depth.
  • Walls: length × height × thickness — remember block cores and cells change the math.

The five classic estimating mistakes

  1. Measuring in inches and forgetting to convert. Six inches is 0.5 ft, not 6. This one error doubles or halves orders.
  2. No waste factor. A cold joint from running short is a permanent weak line across your slab.
  3. Ignoring the gravel base — it is a separate material with its own order.
  4. Trusting one number. Calculate the same pour two ways (per-section and whole-area) and compare.
  5. Forgetting embedded volume. Thick posts, ducts or drain pipes displace concrete; for small items the waste factor covers it, for big ones subtract.

A worked example

Backyard patio, 14 ft × 18 ft, 4 in thick, on decent soil:

  • Area: 14 × 18 = 252 ft²
  • Volume: 252 × (4/12) = 84 ft³
  • With 10% waste: 92.4 ft³
  • In yards: 92.4 ÷ 27 ≈ 3.4 yd³ — order 3.5 yards
  • Bags (for comparison): ≈ 155 of the 80 lb bags → order the truck

Use the slab calculator to run your own numbers, or the cost calculator once you know your local price.

Frequently asked questions

How many square feet does a yard of concrete cover?

One cubic yard covers 80 ft² at 4 in thick, 54 ft² at 6 in, or 40 ft² at 8 in. Divide 324 by your thickness in inches for any other depth.

Should I round up my order?

Round up to the nearest quarter or half yard and keep your waste factor separate. Plants batch in increments; confirm their minimum load and return policy before ordering.

How do I calculate concrete for post holes?

Volume of the hole (π × radius² × depth) minus the post volume below grade. The post-hole calculator does this automatically.